Airports Airport terminals
Otopeni International Airport in Bucarest, Airport Refurbishment and Expansion Plan (Romania)
Preliminary and Detailed design of the civil works and preliminary design of the structures of the following:
- Complete refurbishing of the existing Departure Terminal (15.000 m2)
- Construction of a new finger provided with 5 aviobridges and relevant connections to the existing Departure and Arrival Terminals (15.000 m2)
- Detailed Design of the following infrastructures:
- Rehabilitation of existing Taxiway Charly (25.000 m2)
- Rehabilitation and extension of Apron Charly (60.000 m2)
- Rehabilitation of the Main Apron (150.000 m2)
- Rehabilitation of the internal service and access roads
Client
SEA S.p.A.
Location
Bucarest, Romania
Services
Preliminary and Detailed Design
Cost of works
Euro 147,700,000