Ports and Waterways

Feasibility Study of the new “Piattaforma Europa” of the Port of Leghorn (Italy)

Ports and Waterways Port Master Plan and logistic studies

Feasibility Study of the new “Piattaforma Europa” of the Port of Leghorn (Italy)

The job has been carried out in parallel with the drafting of the new Port Master Plan, finished in 2013, with the aim to study more in deep the proposed new infrastructure for port development, as far as possible preliminarily evaluating their “market attraction”, looking at a possible public / private partnership (PPP) for both the realisation and the operation.

The Port of Leghorn is a Category II Class I port (classification for ports where Port Authorities reside.

The present port includes the Old Port in the south, the New Port and the industrial channel in the north and consists of 4 basins: port facilities include dry docks, quays for dry bulk / general cargo / container / crude oil and oil products, for both commercial and industrial use, as well as ferry passenger / cargo traffic with Sardinia and Corsica islands, and cruise traffic.

The new Master Plan constitutes an important strategic step for Leghorn, not only for the development of the port, but also for the city and the outlying industrial areas, in relation to both an increasingly global market, and the economies and requirements of local development. As far as the commercial port is concerned, the objective is to modernize a port of call which has numerous short-comings which have held back its development, summed up as follows:

  • Limited area of the operative yards, in particular those dealing with container traffic;
  • Navigation / berthing difficulties in the inner port;
  • Unfavourable location of the berths for petrol products which must be transferred into the storage tanks through pipes affecting the working areas;
  • Interference with the Navicelli canal.
  • The present main container facility – Terminal Darsena Toscana – is 1200m long and 250m wide.

The approach channel at the outer harbour is 15 m deep, whereas the access to the S. Stefano Basin and the relevant turning area (width 500 m), as well as to the turning basin of the New Port (diameter 375 m) and thence to the Toscana dock and quay, is through a seaway dredged to a depth of –13.00 m. a.s.l., and through a 100 m wide channel, with a useful dredged width at -13.00 m equal to 70 m. Mooring depths along the eastern part of the Toscana dock are -13.00 m a.s.l..

The Toscana dock has been realized – as a variant to the present Port Master Plan approved in 1973 – by widening the Navicelli canal to the west and building, where the canal enters the new dock, a Vincian gate to eliminate the backflow of the solid transport from the river Arno into the dock itself, as occurs during peak flows. North of Marzocco breakwater and west of Toscana dock, a big job started in early 2000s, the impermeabilized basin to be filled with dredged materials, after becoming the environmental impact critical for the inclusion of the port basin inside the perimeter of the “Polluted Site of National Interest” of Leghorn (2001) and the institution of the Cetacean Sanctuary. 

The Feasibility Study – in compliance with the official Italian laws and technical guidelines – includes:

  1. territorial socio-economic framework
  2. demand analysis
  3. offer analysis
  4. project description, cost estimate
  5. study of the alternatives
  6. operation and maintenance cost estimate
  7. financial analysis (expenses / incomes)
  8. economic analysis (cost / benefit)
  9. environmental impact
  10. public / private partnership model analysis
  11. key design issues.

The seaside demand has been estimated up to 2040, based on international skilled consultant’s studies as well as on other sources and related to main economic indicators (GDP etc.), according to alternative trends. 

Similarly, the landside demand has been estimated and split into different transport means – road/rail/waterway.

Several alternative layouts have been examined, all of them complying with same basic criteria:

  • Compatibility with layout of the dredged materials waterproofed basin (filling tank) under completion.
  • New breakwater at port North side, internal ships turning basin, and access to/from Arno floodway and Calambrone river mouth. 
  • Relocation of oil / oil products / LNG berths and of relevant pipelines to / from the storage facilities, to keep such handling away from urban area.
  • Limitation of seabed excavation to allow the maximum balance between dredged and embankment volumes.
  • Realization through intermediate phases, to be operational in favour of private interest / partnership.

The selected project solution, the so-called Europe Platform, consists of:

  • 2 very large piers, oriented roughly north-east to south-west, as per the dominant local winds, protected by a breakwater approximately 3km long, the South pier intended to container freight, estimated capacity around 3 million TEU (approx. 1200m long by 650m wide, depth suitable for “Post Panamax” last generation container ships), operating on both sides, and the North pier intended for roll-on/roll-off freight – full cargo as well as mixed passenger/cargo (approx. 1000m long by 500m wide), operating on one side, and the head where 3 jetties 250m long are provided. The piers, separated by a dock 300m wide, connected at the root, where a big railway yard is located, are served by a turning basin 800m diameter. New quays will have a total length over 5km, and new yards a total area 190 ha;
  • An oil and dangerous cargo terminal, protected by an additional breakwater. An approach navigation channel wide 250m complete the works.
  • a new railway yard for train operation and link between external network and port, and separate new terminal railway yards for containers and trailers or semi-trailers wagons charging / discharging,
  • a new road bidirectional axis, extension of the present road link to the Darsena Toscana container terminal, serving both new South (container) and North (Ro-Ro) piers.

As far as the cost / benefit analysis, both the financial and the economic analysis show an IRR (internal rate of return) higher than 5% minimum required.

show more info show less info

Client

Port Authority of Leghorn

Location

Leghorn (Livorno) - Italy

Services

Feasibility Study

Cost of works

Euro 1,234,276,500

show more images show less images

Terminals quays and breakwater

Design of a New Cruise Terminal in Bari Port

Terminals quays and breakwater

Rehabilitation of the Port of Shengjin (Albania)

Port master plan and logistic studies

Study of the Adriatic Gateway (Italy)