Urban Planning Buildings and Architecture

Extension of the Presidential Palace (Djibouti)

Urban Planning Buildings and Architecture Urban and industrial planning

Extension of the Presidential Palace (Djibouti)

The scope of the services carried out comprised the following activities:

  • Architecture and civil engineering: waterproofing, metal structure, external paving, paintworks, etc.
  • Mechanical systems: acoustic and thermal studies for the external walls and windows, plumbing, sanitary and drainage networks
  • Electrical systems: smoke detection systems, electrical network, lifts, lighting, etc.

All these activities as well as the revision of the structural project were not included in the framework of the initial agreement and were not part of the tasks to be realized by the Contractor.

In fact, the initial framework of the contract (“Design and Build” – conception and construction comparable to the FIDIC Yellow Book) did not appear to be very suitable for a good advancement of works.

For this reason, the Government of Djibouti agreed to revise the project framework and decided to award TECHNITAL the development of the missing activities as well as the construction supervision.

show more info show less info

Client

Government of Djibouti

Location

Djibouti

Services

Detailed Design, Works Supervision

Cost of works

Euro 1,870,000

djibouti-presidential-ak-5-02
djibouti-presidential-ak-5-03
djibouti-presidential-ak-5-07
djibouti-presidential-ak-5-08
show more images show less images