hydraulic

Optimisation of sewerage network in the district of Valpantena (Italy)

Hydraulics Water supply and sewerage systems

Optimisation of sewerage network in the district of Valpantena (Italy)

The district of Valpantena was provided with a primary pipeline of combined sewerage network (length 16 km), which serves the following towns: Dorighi, Bellori, Lugo, Stallavena, Grezzana, Marzana, Quinto and Poiano.

Originally, all the secondary networks were of mixed type, and only Marzana and Quinto were provided with separated foul and surface drainage sewerage systems. The sewage was conveyed to the wastewater treatment plant of the city of Verona.

This situation required the optimization of the sewerage network through the study of four design options:

  • Option 1: strengthening and upgrading of the existing primary pipeline (Total length of intervention: 13 km);
  • Option 2: separation of the two networks, the main collector and the secondary pipelines. Upgrading of the existing network to be used as the new surface drainage sewer and realization of a new foul sewerage network. (Total length of intervention: 48 km)
  • Option 3: separation of the two networks, the main collector and the secondary pipelines. Upgrading of the existing network to be used for foul sewage and realization of a new surface drainage sewerage network. (Total length of intervention: 43 km)
  • Option 4: separation of the two networks, as follows:

Main Sewer: upgrading of the existing network to be used as the surface drainage sewerage and realization of a new foul sewage network;

Secondary Networks: upgrading of the existing network to serve the foul sewage and realization of a new surface drainage sewage network (Total length of intervention: 4 km).

Based on this sensitivity analysis of the facts, the client will choose the solution to be developed in subsequent phases of the project (preliminary, final and detailed design).

show more info show less info

Client

Acque Veronesi – Provincial Water management authority

Location

Valpantena (Verona) – Italy

Services

Preliminary Design, Detailed Design

Cost of works

Euro 12,066,726

show more images show less images

Hydraulic and hydrodynamic studies

Arcé Hydroelectric Plant (Italy)

River regulation and water resource management

Barrier Against Salt-Water Intrusion at the Estuary of Adige River

River regulation and water resource management

Design of the Rehabilitation of Cumbidanovu Dam (Orgosolo)

Hydraulic and hydrodynamic studies

Hydroelectric Plant Janiski Otoke (Republika Srpska)

River regulation and water resource management

Rehabilitation of Gibbesi Dam

River regulation and water resource management

Rehabilitation of Sciaguana Dam

River regulation and water resource management

Rehabilitation of Serra del Corvo Dam

Hydraulic and hydrodynamic studies

Settimo Hydroelectric Plant (Italy)

Hydraulic and hydrodynamic studies

Valbona hydroelectric power plant reactivation (Italy)