Supervision of works for the restructuring of the Gela – Aragona aqueduct (Italy)

Hydraulics Water supply and sewerage systems

Supervision of works for the restructuring of the Gela – Aragona aqueduct (Italy)

The Gela – Aragona aqueduct is supplied by a major seawater intake at Gela. The water is desalinated in the desalination plant inside the Gela petrochemical complex and subsequently mineralised. By means of a series of pumping stations the potable water (approx. 500l/s) is conveyed to Licata, Agrigento and Aragona, at an elevation of +500 m a.s.l.

The project consists in the renewal of the entire water supply main, replacing the existing fibreglass piping with a spheroidal cast iron pipe, and a general modification of the hydraulic scheme of the main conveyor (81.8 km), with the introduction of 3 tanks in tunnels along the line and booster type pumping stations instead of the existing ones with multistage vertical axis pumps and collecting tanks. 

The new water supply system, which will also be connected to the water supply system of Favara di Burgio, the Voltano aqueduct and the conduit from the Blufi dam, can satisfy the potable water demands of the entire south-central area of Sicily. The tanks in tunnels, which have a total capacity of over 20,000 m3, can provide not only a daily but a seasonal regulation of the water supply. Moreover, the tunnels allow the temperature regulation of the water supply which tends to be rather high owing to the desalination system (multi flash) used upstream

The booster type pumping stations with revolution gage to control the parallel pump groups permits the optimization of the pumps’ operation, minimizing energy waste and protecting the piping against water hammer phenomena due to sudden pump arrests. 

The design system offers great reliability in terms of durability of materials (spheroidal cast iron instead of fibreglass), protection against irregular movement phenomena (inverter and revs gage) and general redundancy of the system (interconnection of the conduits and parallel pumps). 

Furthermore, for the energy point of the view the operation of the whole system has been optimized, allowing significant savings with respect to the present situation.

show more info show less info

Client

Sicilia Acque S.p.A.

Location

Sicily, Italy

Services

Works Supervision

Cost of works

Euro 69,514,000

gela-aragona-l-1-01
gela-aragona-l-1-02
gela-aragona-l-1-03
gela-aragona-l-1-04
show more images show less images

Hydraulic and hydrodynamic studies

Arcé Hydroelectric Plant (Italy)

River regulation and water resource management

Barrier Against Salt-Water Intrusion at the Estuary of Adige River

River regulation and water resource management

Design of the Rehabilitation of Cumbidanovu Dam (Orgosolo)

Hydraulic and hydrodynamic studies

Hydroelectric Plant Janiski Otoke (Republika Srpska)

River regulation and water resource management

Rehabilitation of Gibbesi Dam

River regulation and water resource management

Rehabilitation of Sciaguana Dam

River regulation and water resource management

Rehabilitation of Serra del Corvo Dam

Hydraulic and hydrodynamic studies

Settimo Hydroelectric Plant (Italy)

Hydraulic and hydrodynamic studies

Valbona hydroelectric power plant reactivation (Italy)