Water Treatment

Works for upgrading of Borgomanero wastewater treatment plant (Italy)

Trattamento acque Impianti trattamento acque industriali

Works for upgrading of Borgomanero wastewater treatment plant (Italy)

The plant, built in the early 1980s, serves a population of 38,000 Equivalent Inhabitants with around 60% of industrial waste.

Apart from the age, the decree 152/99 requires a significant upgrading work planned in two subsequent steps. The first step is now concluded and the second step works are underway.

On the whole, the project includes:

  • new screening system with 3 mm spacing;
  • restructuring of sand catcher/separator system;
  • restructuring of the activated sludge biologic treatment line with subdivision on two lines in parallel and nitrogen removal;
  • fine bubble aeration unit to replace turbines;
  • final filtration of effluents;
  • ultraviolet disinfection section;
  • control of odour emissions;
  • new mechanical dehydration unit with high capacity centrifuges;
  • exhaust air extraction and treatment;
  • renovation of structural works.

All works were scheduled and carried out with no interruption of the water purification service.

mostra maggiori info mostra minori info

Cliente

Municipality of Borgomanero (Novara)

Luogo

Borgomanero (Novara)

Servizi

Preliminary Design, Detailed Design, Works Supervision

Costo dei lavori

Euro 1,909,990